Picture of the Cold Steel Ridge table in-progress.

We made the junction boxes by cutting and stacking blocks of 1"-thick polystyrene insulation foam. To provide support for the pipes, we ran a length of 10mm foam board down the middle — this would also allow us to build a walkway on top later.